NUUK BRIDGE

• PRODUCTION OF 65M LONG COMPOSITE BRIDGE IN 4 MONTHS
• DELIVERED TO NUUK, GREENLAND AFTER 25 DAYS OF SAILING THROUGH THE ATLANTIC OCEAN
• 330 TONS OF STEEL WELDED ON THE BRIDGE GIRDER
• 3 PCS OF 110 TON STEEL SECTION INSTALLED ON BARGE BY THE FLOATING CRANE
• 350M3 OF CONCRETE CASTED ON THE BRIDGE DECK
• 50 TONS OF SEA FASTENING ELEMENTS INSTALLED